尊龙凯时 - 人生就是搏!

400-9988-900
Home > News > Company News > Welcome to Truking Central Workshop
Nov 22, 2021

Welcome to Truking Central Workshop

Central Workshop

Phase Ⅳ of Truking Technology is closely connected to the existing industrial park. It is home to several modern buildings such as R&D Center, HR Center, Central Workshop, Smart Secondary Packaging Workshop and Apartment E. Covering over 40,000m2, Central Workshop is the largest workshop in Truking.

Outside view of the Central Workshop

Large green parking belt on the south

A main road up to 36 meters wide on the west

Central Workshop is adjacent to the Smart Secondary Packaging Workshop


Construction of the Central Workshop started in June 2020, and it was officially completed in October and was fully put into operation.

Transportation system: two passenger and freight elevators, 20 cranes

Communication system: WIFI full coverage, 360-degree surveillance, wireless and digital industrial communication comparable to smart factory.

As a scientific research and production base of high-speed intelligent robotic filling lines for aseptic preparations, the Central Workshop is equipped with an intelligent stereoscopic warehouse and a precision testing laboratory. It has an annual production capacity of nearly 1,000 lines. Embedding the concept of flexible, intelligent and lean manufacturing, the workshop enables multi-functions such as assembly, commissioning, and exhibition. It offers a subtle blend of technology, humanization, comfort and modernity.

Showroom

Located in the hall at the main entrance to the west of the Central Workshop, it is magnificent and beautiful.

Sand table

The huge sand table in the exhibition hall shows the development of the Truking Headquarters Park. There are many scenic spots in the Chu Garden, Tian Garden, Zen Garden, and Yu Garden.

Truking Technology adheres to the concept of building factory, scenic area, and community into one.

Onsite installation

Online message

join us

join us

友情链接: